SecBot SecBot
SECBOTREPLAY Home › Report › ERO

ERO · Ero Copper Corp

Ero Copper Corp. · 6-K filed Mar 30, 2026 at 17:36 ET

At the news

BULLISHIMPACT 7/10

6-K filed Mar 30, 2026 at 17:36 ET

Ero Copper Corp. filed a technical report for the Preliminary Economic Assessment (PEA) of its Furnas copper-gold project in Brazil. The PEA outlines a 24-year mine life with a combined open-pit and underground operation, estimating post-tax NPV8% of $2.04 billion and IRR of 27%. The project has a total capital cost of $2.8 billion and would produce copper concentrate with gold and silver by-products. The assessment is preliminary and includes Inferred Mineral Resources which are too speculative to have economic viability demonstrated.

  • Post-tax NPV8% of $2.04 billion with 27% IRR and 3.1-year payback
  • Total capital cost estimated at $2.798 billion ($1.28 billion initial)
  • 24-year mine life with combined open-pit and underground operation
  • Average annual production of 1.2 million tonnes of payable copper

Replay the market's reaction

Step through every 5 minutes around the news, then see how it compares with similar events.

Subscribe for Full Access